Purchase a repair module against the exact robot configurations it is approved to serve. Record the orderable part and revision, serial applicability, required hardware/software combination, installation checks and usable-stock date. A spare is ready for issue when those conditions and its physical acceptance are satisfied.
Modularity can simplify replacement while leaving configuration and replenishment decisions to resolve. Boston Dynamics reports repeated subassemblies and field-replaceable arms, legs, hands and heads on its enterprise Atlas generation. Its evolution account distinguishes that electric product from the earlier hydraulic research robot. Those are vendor descriptions of Atlas, with no service-time promise for another robot. Atlas engineering account · Atlas evolution
Buy the approved replacement boundary
Ask what arrives as the complete module. A perception pod may include sensor, processor, storage and housing while excluding mounting hardware, cables or calibration work. Put the agreed contents, firmware loading and acceptance evidence in the quote and order.
Match the sold code to the approved internal item and revision. Record any supersession conditions instead of treating the newest catalogue revision as interchangeable. The variant BOM guide owns option selection. This service matrix decides which physical spare may replace an installed module on an existing unit.
Keep compatibility beside the stock position
This fictional example concerns civilian inspection robots I-101–I-116 and their complete perception pods. All codes, reports, dates and recorded actions are invented. No actual supplier protocol or stock commitment is implied.
COMP-P24 01 is the example's accepted compatibility record. Both pod revisions have similar housings and connectors. Each factory calibration belongs to its module serial. The installed camera-to-body calibration must be checked after replacement using the approved service plan.
| Sold code and approved item | Robot applicability | Accepted interface and software evidence | Required calibration evidence |
|---|---|---|---|
| S-CM240-A → CM-P24 A | I-101–I-108 | Mechanical MIF-01, power PWR-01, data DIF-01, board-support package BSP-P24 2.1 and firmware VIS-P24 1.4. Acceptance evidence EV-A01. | Factory record for the received module serial, followed by installed CAL-P24 procedure and unit acceptance. |
| S-CM240-B → CM-P24 B | I-109–I-116 | Mechanical MIF-01, power PWR-02, data DIF-02, BSP-P24 3.0 and VIS-P24 2.0. Acceptance evidence EV-B01. | Factory record for that module serial and the B installation/acceptance scope. |
CM-P24 B has no approval for I-104's PWR-01/DIF-01/software combination. Its mechanical similarity cannot close those differences. Use the ICD guide for the underlying endpoint agreement.
The fictional stock snapshot is 24 November 2026 at 12.00 GMT. I-104 needs an applicable spare usable by 25 November at 10.00 GMT for its reserved service slot.
| Item | Accepted physical stock | Reserved for other work | Free applicable stock for I-104 | Issue decision |
|---|---|---|---|---|
| CM-P24 A | 2 pods | 1 pod | 1 pod, available now | Allocate accepted serial A-071 to the repair. |
| CM-P24 B | 2 pods | 0 | 0 | Hold both from this A-configuration repair. |
An additional A pod is quarantined and contributes zero accepted stock. Open PO-SP41/1 contains one A pod with planned usable receipt on 2 December. It contributes zero to the 25 November requirement and remains a separate future receipt.
Issue the applicable pod and retain the hold
At the fictional 25 November service review at 09.00 GMT, a B pod is offered because its enclosure looks the same. The service owner records HOLD-I104-B under COMP-P24 01. Receipt acceptance REC-A071-01 identifies A-071 and its factory calibration record FCAL-A071-01. The owner checks that evidence and allocates, issues and stages A-071 at 09.30 GMT, before the 10.00 GMT parts-staging deadline. Engineering may review B as a future change, with no authority to install it from this repair order.
The approved technician receives authorisation SR-I104-07, the current manufacturer/project service instruction, the restoration package and the exact check plan. That controlled procedure governs isolation, tools, installation and any safety checks. Use the authorised procedure for safety steps and torque specifications.
The technician verifies robot and old/new module identities before work. The repair record preserves removed serial A-014, installed A-071, actual installation time and software image. Installation changes physical history. Return to service waits for the required acceptance evidence.
Close the repair and replenish usable stock
| Service record | Fictional recorded outcome |
|---|---|
| Work and occurrence | SR-I104-07, pod position P1, installed 25 November at 11.00 GMT. |
| Configuration | CM-P24 A, A-071, BSP-P24 2.1 and VIS-P24 1.4 match COMP-P24 01. |
| Post-repair evidence | CHK-I104-07 records the approved interface/startup checks. CAL-I104-07 records the new installed calibration. FUNC-I104-07 covers the service plan's inspection task. |
| Release | Acceptance authority records ACC-I104-07 against the maintained configuration on 26 November at 10.00 GMT. Earlier acceptance remains in history. |
| Removed module | A-014 goes to a separately tracked repair/quarantine disposition, with zero available spare quantity. |
The example assumes these referenced checks passed. Real records must contain results, conditions and authority. The build-record guide owns the detailed installed-event history.
After issue, accepted A stock falls from two to one. Its one other-work reservation leaves zero free A pods. The example's service policy targets two free pods by 1 December. Existing PO-SP41/1 eventually supplies one, so an additional one is needed to restore that target. Its 2 December date also misses the buffer deadline.
The buyer therefore assesses advancing the existing one-pod receipt and purchasing one additional approved A pod. Preserve both line references, required usable dates and supplier confirmations. The chosen two-pod target is an illustrative stocking decision, with no measured failure-rate or reliability basis.
Copy the service and replenishment row
| Robot/configuration and position | Sold/approved spare revision and serial | Compatibility evidence | Required usable date and free stock | Work authorisation and technician | Removed/installed identities and time | Post-repair checks and calibration | Acceptance authority/state | Replenishment refs, quantity and date |
|---|---|---|---|---|---|---|---|---|
Start by checking the next repair against the matrix. Resolve missing compatibility or calibration evidence before issue. Keep future receipt commitments and removed modules separate from accepted, available stock.