San Francisco Circuits
PCB fabrication, SMT, through-hole and BGA assembly, Turnkey procurement
San Mateo office · partner manufacture
Capabilities and materials
- PCB fabrication
- SMT assembly
- through-hole assembly
- BGA assembly
- turnkey procurement
- conformal coating
- box build
Materials FR4, polyimide, Rogers, metal-core PCB
Location and handoff
1660 S Amphlett Blvd #200, San Mateo, CA 94402
Partner manufacturing/assembly network; specific production and ship locations unknown
Official assembly page describes shipment/delivery through assembly facility; no San Mateo pickup or local factory evidenced.
Order fit
Small, medium and high volume stated; no numeric limits.
Prototype · Production / pilot
Lead times
Standard
'Standard 5 day turns' for assembly. Same page separately gives average 1–5-day assembly and typical 1–3 business-day component sourcing. No total door-to-door bound or day-unit stated.
Endpoint not specified. day convention / unit unspecified
Clock starts: Not specified; complete material kit/procurement is separate.
Published timing source · Applies to this pcb fabrication and assembly listing.
Rush
'Next day rush' assembly offered; day convention, start and receipt endpoint not specified. Not an upper-bound promise.
Endpoint not specified. day convention / unit unspecified
Clock starts: Not specified; requires supplier review.
Published timing source · Applies to this pcb fabrication and assembly listing.
Inspection
Partner capabilities list BGA X-ray, AOI, ICT, flying probe and functional tests; specify which tests/reports are included in a quote.
Sources
Reviewed . Arc selected this supplier using public capability, location and order information. These are supplier-published claims, not observed tests.
- PCB Manufacturing & Assembly | San Francisco Circuits
San Mateo contact office; prototype/production PCB fab and assembly via diverse vendor relationships. FR4/polyimide/Rogers and rigid/flex/metal-core capabilities.
- PCB Assembly Services | Proto & Production | San Francisco Circuits
Strong network of partners explicitly stated. Next-day rush/standard five-day turns; final lead time is procurement plus assembly. BOM verification typically two business days; sourcing 1–3 business days depending on availability; assembly units/clock endpoints unclear.