Skip to supplier details
Back to PCB fabrication and assembly

Sierra Circuits

Rigid, flex and rigid-flex PCBs, SMT and through-hole assembly, Turnkey component sourcing

Sunnyvale · owned fab and assembly · arranged pickup

Capabilities and materials

  • PCB fabrication
  • SMT assembly
  • through-hole assembly
  • turnkey component procurement
  • rigid PCB
  • flex PCB
  • rigid-flex PCB

Materials FR4, lead-free FR4, Rogers, polyimide

Location and handoff

1108 West Evelyn Avenue, Sunnyvale, CA 94086

Owned PCB manufacturing and assembly campus in Sunnyvale, CA

Turnkey PRO specifications list FedEx/UPS and Will Call; official about page confirms Sunnyvale fabrication/assembly campus.

Order fit

Turnkey PRO: most designs 2–100 assembled boards with panel/turn-time limits; other service/custom quantities differ. No single company-wide range.

Prototype · Production / pilot

Lead times

Standard

  • Selected seven-business-day Turnkey PRO option; subject to design validation/component readiness, panel limits and quote. Five-day option is temporarily unavailable. Shipping endpoint, transit extra.

    Shipment, transit extra. business days

    Clock starts: Day 0 starts when validation finishes or final consigned components arrive, whichever is later; payment also required.

    Offer quantity bounds: 2–100.

    Published timing source · Applies to this pcb fabrication and assembly listing.

  • Selected ten-business-day Turnkey PRO option; subject to design validation/component readiness, panel limits and quote. Five-day option is temporarily unavailable. Shipping endpoint, transit extra.

    Shipment, transit extra. business days

    Clock starts: Day 0 starts when validation finishes or final consigned components arrive, whichever is later; payment also required.

    Offer quantity bounds: 2–100.

    Published timing source · Applies to this pcb fabrication and assembly listing.

  • Detailed Turnkey PRO specs list selected fifteen-day option; day convention not explicit for this option in checked sources. No automatic day-unit conversion. Shipping endpoint, transit extra.

    Shipment, transit extra. day convention / unit unspecified

    Clock starts: Day 0 starts when validation finishes or final consigned components arrive, whichever is later; payment also required.

    Offer quantity bounds: 2–100.

    Published timing source · Applies to this pcb fabrication and assembly listing.

Inspection

Turnkey PRO states IPC-A-610 Class 2 assembly and 100% net-list test on every board; IPC coupons/microsection reports require custom order. Functional-test coverage must be specified.

Sources

Reviewed . Arc selected this supplier using public capability, location and order information. These are supplier-published claims, not observed tests.