Skip to content

Trojan Construction Testing Denny Laboratory

Trojan Construction Testing ServicesDenny, Falkirk

UKAS 9522 issue 012 dated 5 October 2026 identifies 16 Winchester Avenue, Denny, Falkirk. Laboratory rows list aggregate physical/fragmentation, hardened concrete compression/flexural/density, soil classification/compaction/CBR and designated pavement-core work. Suitable Site sampling and field tests retain separate allocations.

Reviewed by Arc · About this review

Key facts

Public information not available. Contact test facility provider for more information.

Testing capabilities

Concrete and aggregate laboratory tests

Laboratory rows list aggregate sieving, Los Angeles fragmentation and water content, concrete specimen shape/dimensions/curing, cube compression, density and flexural strength. Concrete-core examination/compression has shared Laboratory/Site allocation.

Soil and pavement-core methods

Local methods include soil classification, rammer compaction, MCV and CBR, selected pavement thickness/core logging and named calculated CBR methods. Field sampling, fresh-concrete slump/air and pavement surface measurements remain under their listed Site or shared codes.

Equipment and published limits

Public information not available. Contact test facility provider for more information.

Access and contact

The schedule names Mr P. Goodwin and publishes peter@trojantesting.co.uk and +44 (0)1324 554477, with local mobile 07753 806713. Identify the material, laboratory/field requirement, method and report when enquiring.

Facility contact

Address
16 Winchester Avenue
Denny, Falkirk, FK6 6QE

Standards and accreditation

UKAS 9522 — exact construction method codes
Issue 012 dated 5 October 2026 states ISO/IEC 17025:2017 and product/method-specific BS EN 933/1097, BS EN 12390/12504, BS 1377/BS EN ISO 17892 and pavement references. Laboratory, Site and shared allocations remain separate; a group construction-testing label does not extend every field method to the lab.

What to confirm with the facility

  • Site-only sampling, slump/air, macrotexture, field density and penetration/plate work are separate from Laboratory rows. Shared core/thickness/calculated-CBR methods retain their individual code and method context; no universal force or specimen envelope is stated.
  • Confirm exact allocation, material/sample and preparation, method edition, reporting, availability and quotation.

Before requesting a test

Public information not available. Contact test facility provider for more information.

Frequently asked questions

Public information not available. Contact test facility provider for more information.

Further reading

Sources and review

Arc reviewed the original sources on 2026-10-13. The cited material supports the bounded site information presented here. Test suitability and commercial arrangements require direct confirmation.

Arc publishes this directory entry and does not operate the test facility. Suggest a correction to Arc with a supporting source.

  1. UKAS 9522 Trojan Construction Testing, issue 012

    United Kingdom Accreditation Service (UKAS) · Reviewed

    Issue 012 dated 5 October 2026 allocates Laboratory/Site construction methods separately, including shared cube preparation/core/thickness rows and Site-only sampling/field tests. No method edition is corrected or combined across separate pavement-reinstatement contexts.