On this page

Advance Shipping Notice Template for Split Deliveries

An advance shipping notice template for split deliveries should identify one shipment against the acknowledged PO line, with the released part revision, shipped quantity, unit, boxes, lots, tracking and current arrival estimate. Retain the notice ID and version so a correction replaces the earlier notice for that shipment. Record physical receipt and quality release as later events, with the remaining unshipped quantity visible.

Start from the supplier PO acknowledgement, which owns the agreed quantity, scope and split schedule. The ASN tells receiving what to expect in a particular delivery.

Copy the ASN header and line worksheets

Oracle's archived iSupplier Portal shipping guide describes notices created from PO shipment lines. Its fields include shipment number, shipment date, expected receipt date, carrier, waybill, packing slip and container information. It also describes splitting shipment-line quantities and adding lot or serial details for configured items. These are documented Oracle fields, rather than a universal ASN format.

Use this independent header worksheet for one shipment. Record a timezone for timestamps and identify dispatch as planned or actual. Keep the PO's committed date beside the latest ETA.

Blank split-delivery ASN header
ASN header fieldValue and evidence
ASN ID, version, issue timestamp and status
Physical shipment ID and superseded notice reference
Supplier, ship-from site and receiving site/address
PO number/version and acknowledgement reference
Carrier, service, tracking or waybill reference
Dispatch date/time, planned or actual, and evidence
PO committed arrival date and current ETA
Box count and packing-list reference
Required document references and coverage
Receiving contact, booked slot and handling instructions
Change reason, notifier and buyer follow-up owner

Copy this separate line worksheet. Use a row per part/lot/box combination. Preserve the same purchasing unit throughout and make the box quantities sum to the shipment quantity.

Blank split-delivery ASN line
ASN ID/version and shipmentPO version, line and schedulePart and drawing revisionShipped quantity and unitBox and lot/serial scopeEvidence references and coverageReceiving/inspection planOpen condition and owner

Work through a 25-of-40 shipment

Every supplier, part, notice, date and event below is fictional teaching data for a civilian US robotics build. Morrow CNC LLC has acknowledged PO-AS27-040 version 2, line 10, for 40 ea PLT-AS27 Rev B motor plates. The buyer has accepted schedule S1 for 25 and S2 for 15 under ACK-AS27-01. Both schedules retain drawing DW-PLT-AS27-B, material, finish and inspection requirements.

S1's committed arrival is 14 January 2027. The supplier hands its first 25 plates to the carrier on 12 January and issues ASN-AS27-01 version 1. Its two boxes contain 15 and 10 plates from LOT-AS27-A. Fifteen plates remain at the supplier for S2.

On 13 January, a carrier update moves the ETA to 15 January. The supplier sends ASN-AS27-01 version 2, preserving the shipment ID, quantities, part revision and boxes. The buyer records version 1 as superseded and version 2 as current. The committed PO date remains 14 January until the responsible buyer records an accepted change.

ASN: ASN-AS27-01 v2, issued 13 January 2027 at 15.00 CST
Status: current, supersedes ASN-AS27-01 v1
Shipment: SH-AS27-01, same physical shipment as v1
Supplier/site: Morrow CNC LLC, MC-01, Texas
Receiving site: RX-AS27, Austin, Texas
PO: PO-AS27-040 v2, line 10, schedule S1, ACK-AS27-01
Part: 25 ea PLT-AS27 Rev B, drawing DW-PLT-AS27-B
Dispatch: actual 12 January at 10.00 CST, pickup record PICK-AS27-01
Committed arrival: 14 January, current ETA: 15 January
Carrier/tracking: fictional Carrier C, TRACK-AS27-01
Boxes: 2, packing list PACK-AS27-01
Reason: carrier ETA update, buyer Maya owns schedule follow-up
Fictional two-box shipment manifest
BoxQuantity and partLot and required evidence
BX-AS27-0115 ea PLT-AS27 Rev BLOT-AS27-A, item IDs A01–A15
BX-AS27-0210 ea PLT-AS27 Rev BLOT-AS27-A, item IDs A16–A25

PACK-AS27-01 maps both boxes to the PO line. The fictional CoC-AS27-A, material record MAT-AS27-A and dimensional report DIM-AS27-A cover A01–A25 under the agreed requirements. Receiving checks those references against the physical lot. Quality retains the detailed results and release decision.

Replace the notice version, then reconcile events

In this manual template, retain both versions and mark one current for SH-AS27-01. Version 2 changes the ETA for the same 25 plates. A new physical shipment for S2 gets a new shipment ID and notice. In a purchasing application, follow its supported correction or cancellation process while preserving that relationship.

The following completed events are also fictional. The 40-unit order remains unchanged, with no returns or cancelled quantities.

Dated 40-plate shipment reconciliation
Event and evidenceShipped cumulativelyReceived cumulativelyAcceptedReceived awaiting release or heldIn transitStill to ship
11 January: ACK-AS27-010000040
12 January: carrier pickup, ASN v1250002515
13 January: revised ASN v2250002515
15 January: receipt RCPT-AS27-012525025 awaiting release015
19 January: quality decision IR-AS27-A2525232 held015

At receipt, the dock count and box/lot check establish 25 received. Inspection later supports release of A01–A23, while A24–A25 remain held under NCR-AS27-01. Use the incoming CNC inspection checklist for the actual drawing checks, containment and release authority.

The reconciliation is 40 = 15 still to ship + 0 in transit + 23 accepted + 2 held. Shipped and received columns are cumulative views of those same units. Count the plates once across their current physical states. The remaining 15 are still an open supplier commitment, and the two held plates need a separate quality disposition.

Frequently asked questions

Does a revised ASN add another shipment quantity?

When it refers to the same physical shipment, replace the current version and retain the earlier notice as history. In this example both versions describe the same 25 plates, so 15 remain to ship.

Which date changes when the carrier reports a delay?

Update the ETA with the carrier evidence. Keep actual dispatch tied to pickup, actual arrival tied to receiving and acceptance tied to quality release. A changed contractual commitment needs the buyer's recorded decision.

Can receiving release the lot from the ASN's document references?

Use them to find and check the required evidence against the delivered lot. Release the accepted quantity through the agreed inspection and authority process. Record missing evidence or held items with an owner.

Review a split delivery in an Arc demo

Bring one acknowledged PO line, its current ASN and the receiving record to discuss how the buyer will follow the shipped quantity and the remaining supplier commitment.

Arc is the agentic operating system for robotics procurement and supplier management. The platform connects the tools you already use and brings the released BOM, open purchase orders and supplier replies together so buyers and AI agents can track each part. It helps buyers find suppliers and compare quotes, then follows up on the orders they approve to confirm quantities and delivery dates and flag parts that could hold up the next build.