Manage supplier emails with AI by matching each message to the PO version, line, quantity and released part revision, then preparing a follow-up that a buyer can review. Keep the original terms and the latest supplier reply visible. The buyer approves the final outgoing message, and a changed draft returns for approval.
The following examples are fictional and unsent. They illustrate the information an agent should retain, not a completed email run or supplier response.
Handle missing replies, splits and obsolete revisions
| Trigger | Evidence to retain | Draft and stop condition |
|---|---|---|
| No acknowledgement | PO/version/line, supplier, issued scope, due date and last message | Ask for quantity-specific confirmation; stop after the team’s agreed reminder limit or escalate |
| Split delivery | Original five-piece line, proposed three-plus-two schedules and dates | Ask the buyer to review each quantity/date; never count two schedules as ten pieces |
| Obsolete revision | Released revision, affected PO and supplier notice | Hold any substitute or re-quote until engineering reviews applicability and the buyer approves the request |
| Supplier question | Exact question, PO terms, drawing and supporting source | Draft an answer; route an unresolved technical point to engineering |
| Closed or cancelled order | Recorded disposition and final supplier communication | Stop the sequence and reconcile any remaining obligation |
In WR-12, B’s eight Rev D brackets are ordered but undated at the December 7 snapshot. A follow-up can request a quantity-specific dock date. A December 11 proposal does not become accepted merely because an agent extracts it: the buyer’s schedule decision and supplier acknowledgement establish the accepted version. The original December 9 requested dock remains a request, not a supplier promise.
Review the message and the action behind it
| Check | What the buyer verifies |
|---|---|
| Identity | Correct supplier, recipient, PO number, version, line and contact |
| Scope | Released revision, quantity/unit, outstanding balance and site |
| Source | Current PO terms, prior replies, approved template and timestamps |
| Action | One precise question, requested response date and escalation owner |
| Authority | Buyer approves send; technical substitution goes to engineering |
| Change control | Any edit after approval returns the revised draft for approval |
Arc can use rules and templates to draft reminders and answers from the PO and supplier correspondence. It matches a confirmed quantity and date to the relevant line, while the buyer reviews changed terms and approves outgoing messages or issued-order amendments. When a revision change or obsolescence creates a gap, Arc can identify verified alternatives from approved suppliers and prepare a re-quote for buyer approval. The configured inbox and ERP permissions determine which records are read or updated.
Read the open-PO guide for the full WR-12 schedule history and the RFQ guide for scope and recipient approval. The exercise above sends nothing.
Frequently asked questions
Can an agent send supplier reminders without review?
Set the follow-up rules and templates, then review and approve the outgoing reminder or reply. If the approved draft is edited, it returns for approval before it is sent.
Does a supplier reply change the purchase order?
A reply is evidence of a proposal or confirmation. A commercial change to the issued PO requires the buyer’s decision and approved amendment under the configured process.
What should stop an automated follow-up sequence?
Stop or escalate when a reply needs a buyer or engineering decision, the PO is cancelled or closed, a revision is obsolete, the recipient is wrong, or the agreed reminder limit is reached.