On this page

Custom PCB vs Off-the-Shelf Module for Robotics

Choose an off-the-shelf production module when the installed assembly meets the robot's requirements, can be qualified for the pilot date and fits the planned quantity. Choose a custom PCB when a required interface or physical constraint needs a different implementation, or credible future volume can repay the additional engineering and qualification cost. Use an evaluation board to resolve the device or software questions that could change either choice.

The lowest board price may belong to a route that cannot deliver accepted hardware in time. Compare the complete installed assembly, development work and usable receipt date before awarding the pilot.

Keep the three purchasing routes distinct

An evaluation board exposes a device for experiments. A production module is an orderable subsystem that still needs its surrounding hardware and software. A custom board gives the team responsibility for the selected circuit implementation, manufacturing files and future changes.

Evaluation, module and custom-board purchasing routes
RouteUseful buyer situationRemaining evidence before production award
Evaluation board or development kitProcessor, sensor interaction or algorithm feasibility is still unresolved.Exact intended-use terms, representative installed tests and a permitted production implementation.
Production module with a bought or custom carrierThe module meets the workload and the carrier can provide the required power, connections and mechanical fit.Exact module/carrier identities, software image, thermal solution, source commitment and product-level acceptance.
Custom PCB implementing the required electronicsAvailable assemblies fail a necessary constraint, or planned volume supports the extra development.Reviewed design, component supply, bring-up, qualification, manufacturing test and retained design/support ownership.

Infineon's evaluation/reference guide describes evaluation hardware for early device testing and reference designs as application starting points that require adaptation and validation. Check the actual board's documentation and terms. Infineon evaluation and reference designs

For a concrete module route, NVIDIA says Jetson developer kits are for development and prototyping. Production Jetson modules use a carrier designed or procured for the end product and a software image developed by the integrator. That explains the purchasing boundary. It does not establish that a particular carrier, camera or robot enclosure passes your requirements. The sensor and compute sourcing guide owns the detailed supplier and exact-module checks. NVIDIA Jetson FAQ

This guide compares design routes using manufacturer documentation and a fictional buying case. Arc publishes robotics workflow guides and has a commercial interest in related software evaluations. The calculations below are teaching examples, with no vendor prices or hardware trial results.

Agree the installed acceptance gates before comparing costs

Use the same operating envelope for both eligible production routes. In this fictional case, a civilian indoor inspection robot needs one processing and I/O assembly per unit. Its invented requirements include a battery-input range of 18–30 V, two USB camera connections, a CAN link and operation inside the specified enclosure at 35°C ambient.

Both routes must run fictional inspection pipeline VIS-P24 v1 on two simultaneous 1280 × 720 camera streams. Each stream must produce at least 15 analysed frames per second in every 60-second window during a 60-minute run. The 99th-percentile delay from image capture to result must stay at or below 100 ms. Processor, carrier, storage and cooling together must draw no more than 25 W averaged over each 60-second window. Camera power is supplied separately and excluded from that limit.

After a controlled application termination or power cycle, valid image output must resume within 60 seconds. The CAN status must report unavailable results until the pipeline recovers. This checks inspection-data recovery and makes no safety-control claim.

Use the same recorded camera input, timestamps, enclosure, ambient temperature and supply settings for both routes. Log frame results, input power and recovery times at 18 V, 24 V and 30 V. Check installed temperatures against each component's documented continuous limits. All these limits are fictional design inputs, with no measured pass result. The pilot recommendation remains conditional on the engineering owner recording a pass for the offered configuration.

Installed acceptance gates for both production routes
GateEvidence to request for each production routeDecision consequence
Interfaces and powerPin definitions, voltage levels, connector/cable scope, input range, transient limits, startup and fault behaviour.Hold a route whose offered configuration conflicts with an agreed interface. Use the ICD guide to resolve endpoint meanings.
Installed mechanics and thermal operationBoard outline, mounting, cable access, cooling path and workload results in the intended enclosure and ambient conditions.A bench demonstration supports its tested setup. Require evidence for the installed operating envelope.
Software and recoveryExact image, boot configuration, drivers, SDK dependencies, update support and tested reset/recovery sequence.Budget porting and maintenance for the chosen hardware and image. Retain the configuration used in acceptance.
Manufacturing and receiptApproved BOM/drawing revision, firmware loading, functional test limits, programming access, traceability and incoming acceptance scope.First powered boards remain engineering samples until the required release and manufacturing evidence exists.
Supply and changesExact seller and production part, quote validity, MOQ, order multiple, capacity, lead-time assumptions and change/EOL process.Record source eligibility and an agreed usable receipt for the actual quantity.
Ownership and supportAccess to design files, firmware/build tools, fixture and test software, support responsibilities and change charges.Assign future redesign, supplier escalation and field-support work before award.

NVIDIA publishes module lifecycle information separately from developer kits, for which it specifies no lifecycle. Its published horizon can inform support planning. Check the exact product and current seller commitment for the next lot. NVIDIA Jetson product lifecycle

Compare NRE and accepted-unit cost on the same basis

Non-recurring engineering, or NRE, is the fixed work needed to deliver the selected design and its qualification package. Include integration engineering for a module route too. A carrier, power system, fixture and software adaptation can require substantial work even when the processor is bought complete.

For each route, separate that fixed work from the cost per accepted production assembly. Request material, fabrication, assembly and test scope explicitly. Altium's PCBA RFQ article explains should-cost breakdowns and quotation assumptions. Use actual offers for the buying decision. PCBA RFQ and should-cost scope

The following GBP figures are wholly fictional, with constant unit costs assumed for the model. Both production routes are assumed capable of the same agreed function after qualification. That assumption must be proved before either can be released.

Fictional fixed engineering and qualification costs
Fixed workProduction module and carrierCustom PCB
Design, software integration and bring-up engineering£3,000£16,000
Prototype hardware and production-test fixtures£2,000£8,000
Qualification and release work£3,000£8,000
Total NRE£8,000£32,000
Fictional cost per accepted assembly
Cost per accepted assemblyProduction module and carrierCustom PCB
Processing hardware£110 bought module£65 components and bare-board fabrication
Carrier or remaining circuit, power, storage, cooling and connection hardware£45£35
Assembly, flashing, functional test, normal manufacturing losses and delivery£25£20
Total accepted-unit cost£180£120

The unit figures include the route-specific hardware and agreed production work through usable receipt. Prototype units and fixtures sit in NRE. Common cameras, motors, battery and robot enclosure costs are excluded equally. Tax, financing, future field repairs and later redesigns are outside this simple model. Price those separately when they differ between offers.

Do not add a scrap allowance again if the quoted accepted-unit cost already includes normal manufacturing losses. If a quotation covers units shipped before test or excludes a fixture, reconcile it to the same boundary first.

Calculate the volume crossover

Let n be the number of accepted production assemblies purchased under the chosen design. This is a cumulative quantity, with one assembly per robot in the example.

module total, GBP = 8,000 + 180 × n
custom total, GBP = 32,000 + 120 × n
additional custom NRE = 32,000 - 8,000 = 24,000 GBP
accepted-unit saving = 180 - 120 = 60 GBP per assembly
equal-cost quantity = 24,000 / 60 = 400 assemblies
Production quantity and total cost comparison
Accepted quantityModule-route totalCustom-route totalLower model cost
25 pilot assemblies£12,500£35,000Module by £22,500
100 assemblies£26,000£44,000Module by £18,000
400 assemblies£80,000£80,000Equal
1,000 assemblies£188,000£152,000Custom by £36,000

The custom route becomes cheaper above 400 accepted assemblies under these assumptions. A sales aspiration of 1,000 robots supplies no buying commitment. Use the forecast the team can defend within the supported design horizon, then examine lower volumes.

Cost crossover sensitivity
Changed fictional assumptionNRE differenceUnit savingEqual-cost quantity
Base case£24,000£60400
Custom accepted-unit cost rises to £140£24,000£40600
Custom qualification needs another £8,000£32,000£60533.33, with custom cheaper from 534 units

If both unit costs become equal, extra custom NRE has no cost crossover in this model. A necessary interface or enclosure change may still justify it. That is a requirement-driven decision with its own schedule and acceptance case.

Check the pilot date before committing to the volume route

The example team needs 25 accepted assemblies by 15 January 2027. These dates are fictional plans, with supplier and engineering capacity assumed for the illustration.

Qualification and usable pilot dates
RouteFirst representative hardwareQualification and test readinessUsable pilot lotDecision for 15 January
Production module and carrier8 December 202611 January 202713 January 2027, subject to receipt acceptanceCan meet the date if every gate closes as planned.
Custom PCB12 January 202712 February 20271 March 2027, subject to receipt acceptanceRequires a later pilot date or a separate earlier route.

The custom route's lower forecast cost at 1,000 units does not fill the January requirement. The buyer can choose the module route for the pilot and assess a later custom rollout with its own funding, qualification and quantity decision. Obtain an accepted scope before changing orders already placed.

Recalculate from the time of that later decision. If the £8,000 module NRE has already been spent and none reduces the custom work, it is a sunk cost. Switching then requires £32,000 of new fixed work. At £60 saving per subsequent unit, custom becomes cheaper from 534 subsequent assemblies. Do not keep using the original 400-unit threshold after paying for the first route.

Ask the supplier and engineering owner for the latest date each gate must close. Include DFM review, scarce component commitments, programming/test readiness, transport and receiving disposition. Track an offered date separately from an acknowledged order and accepted physical material.

Copy the buyer decision row before the RFQ

Record the current choice and what would reopen it. A pilot award may authorise only a small module lot while retaining a separate custom-board proposal.

Blank board or module buyer decision row
Required quantity and usable dateExact route/configuration and intended useOpen interface, thermal and software gatesNRE and accepted-unit cost with inclusionsForecast and sensitivityMOQ, source and quote expiryQualification/usable datesDecision owner and deadlineChosen scope and reopening condition

Use the BOM RFQ template to request matched quantities, revisions and acceptance scope. The quote comparison guide handles returned offers. If supply slips, use the long-lead alternatives guide to resolve the affected build.

If the team supplies components to the board assembler, agree that purchasing boundary in the offer and use the consigned-component reconciliation template after material moves. It records contractor stock, fitted parts, scrap and returns.

Move faster without compromising engineering rigour.

Bring a module offer and a custom-board estimate with their qualification plans to an Arc demo.